Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1429782.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 11/04/2019 5
Initial Penalty: $3,978.00
Current Penalty: $3,978.00
Issuance Date: 10/11/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0636900
Contest Date:
Final Order: 11/06/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/11/2019 | $3,978.00 | 11/04/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) On or about September 10, 2019, and at times prior thereto, the employer did not ensure portions of the scaffolding were fully planked, exposing employees to fall hazards.
Translate