Violation Detail
Standard Cited: 19100269 L03 III B Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1429491.015
Citation: 01001
Citation Type: Serious
Abatement Date: 12/19/2019 5
Initial Penalty: $9,282.00
Current Penalty: $5,569.20
Issuance Date: 11/26/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 12/17/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/17/2019 | $5,569.20 | 12/19/2019 | Serious | |
| Penalty | Z: Issued | 11/26/2019 | $9,282.00 | 12/19/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(l)(3)(iii)(B): The energized part is insulated from the employee and from any other conductive object at a different potential section. (a) Pole 3824 Jefferson Street, Houston, MS - On or about September 06, 2019, employees working near an energized 14.4 kV power line that was not adequately insulated were exposed to electrical hazards.
Translate