Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1427234.015
Citation: 01001D
Citation Type: Other
Abatement Date: 12/18/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/21/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity:
Report ID: 0627510
Contest Date:
Final Order: 12/16/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/16/2019 | $0.00 | 12/18/2019 | Other | |
| Penalty | Z: Issued | 11/21/2019 | $0.00 | 12/18/2019 | Serious |
Text For Citation: 01 Item/Group: 001D Hazard:
29 CFR 1910.147(d)(6): Prior to starting work on machines or equipment that have been locked out or tagged out, the authorized employee did not verify that isolation and deenergization of the machine or equipment had been accomplished: On or about August 27, 2019 employees working on the HSC 5B interstitial #5B02 air handler were exposed to caught in hazards when not provided a program consisting of energy control procedures.