Violation Detail
Standard Cited: 19260761 B Training.
Inspection Nr: 1424178.015
Citation: 01003
Citation Type: Other
Abatement Date: 01/06/2020 2
Initial Penalty: $9,282.00
Current Penalty: $6,033.30
Issuance Date: 12/02/2019
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity:
Report ID: 0316300
Contest Date:
Final Order: 12/31/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/31/2019 | $6,033.30 | 01/06/2020 | Other | |
| Penalty | Z: Issued | 12/02/2019 | $9,282.00 | 01/06/2020 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.761(b): The employer did not train each employee exposed to a fall hazard in accordance with the requirements of 29 CFR 1926.761: a) Fort Lee: On or about 08/15/2019, employees engaged in the installation of metal curtain walls and metal roof panels were not trained as a result an employee fell 18 feet to the ground. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.