Violation Detail
Standard Cited: 19260760 D01 Fall protection.
Inspection Nr: 1424178.015
Citation: 01002
Citation Type: Serious
Abatement Date: 12/27/2019 2
Initial Penalty: $9,282.00
Current Penalty: $6,033.30
Issuance Date: 12/02/2019
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity: 10
Report ID: 0316300
Contest Date:
Final Order: 12/31/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/31/2019 | $6,033.30 | 12/27/2019 | Serious | |
| Penalty | Z: Issued | 12/02/2019 | $9,282.00 | 12/27/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.760(d)(1): Guardrail systems, safety net systems, personal fall arrest systems, positioning device systems and their components did not conform to the criteria in 1926.502 (Appendix G to this subpart): a) Fort Lee Army Base: On or about 08/15/2019, the anchorage used for attachment for personal fall arrest equipment was not capable of supporting at least 5,000 pounds per employee attached nor was it designed, installed and used as follows: As part of a complete personal fall arrest system which maintains a safety factor of at least two; and under the supervision of a qualified person. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.