Violation Detail
Standard Cited: 19100269 D06 VII Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1420813.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/31/2019 2
Initial Penalty: $3,220.00
Current Penalty: $1,932.00
Issuance Date: 10/04/2019
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC): A;R
Gravity: 5
Report ID: 0830100
Contest Date:
Final Order: 10/21/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/21/2019 | $1,932.00 | 10/31/2019 | Serious | |
| Penalty | Z: Issued | 10/04/2019 | $3,220.00 | 10/31/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(d)(6)(vii): Before starting work on machines or equipment that had been locked out or tagged out, the authorized employee did not verify that isolation and deenergizing of the machine or equipment had been accomplished: a) Busby Substation: On August 2, 2019 and at times prior, employees were exposed to shock hazards of approximately 7200 volts of A/C electricity while clearing debris from Big Horn County Electric's equipment.