Violation Detail
Standard Cited: 19100333 C03 III A Selection and use of work practices
Inspection Nr: 1418248.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 11/20/2019 2
Initial Penalty: $9,282.00
Current Penalty: $9,282.00
Issuance Date: 11/14/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A;R
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 12/10/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/10/2019 | $9,282.00 | 11/20/2019 | Serious | |
| Penalty | Z: Issued | 11/14/2019 | $9,282.00 | 11/20/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.333(c)(3)(iii)(A): Vehicles or mechanical equipment capable of having parts of their structures elevated near energized overhead lines were not operated so that a clearance of 10 feet (305 cm) was maintained: a. NH Rt. 101 East, Mile Marker 127 - On 7/24/2019, an employee was seriously injured when he received an electrical shock while performing crack sealing work. A light tower being transported on the back of a truck bed struck the overhead power line that crossed over the highway.
Translate