Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1417032.015
Citation: 01001
Citation Type: Serious
Abatement Date: 01/28/2020 2
Initial Penalty: $11,934.00
Current Penalty: $5,967.00
Issuance Date: 12/09/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 12/19/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/19/2019 | $5,967.00 | 01/28/2020 | Serious | |
| Penalty | Z: Issued | 12/09/2019 | $11,934.00 | 01/28/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) Site: In the Compounding Area, Building A, Lower Level, Lines 1-3 and Building B, Lower Level, Lines 4-5 in the production area at the facility located at 170 Pioneer Drive, Leominster, MA 01453: On 7/12/2019 the Energy Control Procedure for the Dicer was not utilized when an employee accessed the point of operation of the Dicer to clear a jam.
Translate