Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1416466.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/09/2019 2
Initial Penalty: $3,978.00
Current Penalty: $2,386.80
Issuance Date: 09/13/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 10/10/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/10/2019 | $2,386.80 | 10/09/2019 | Serious | |
| Penalty | Z: Issued | 09/13/2019 | $3,978.00 | 10/09/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were not erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows: a) On or about July 5, 2019, employees were exposed to electrical hazards while working from an aerial lift near uninsulated power lines closer than 10-feet.