Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1411300.015
Citation: 01001
Citation Type: Serious
Abatement Date: 12/10/2019 2
Initial Penalty: $11,934.00
Current Penalty: $7,160.00
Issuance Date: 11/14/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0213900
Contest Date:
Final Order: 12/05/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/05/2019 | $7,160.00 | 12/10/2019 | Serious | |
| Penalty | Z: Issued | 11/14/2019 | $11,934.00 | 11/26/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) 301 Larchmont Blvd. Mt. Laurel, NJ./Office Area: A 277 Volt light fixture was not de-energized prior to an employee removing the fixture resulting in electrical shock, on or about 6/27/19. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Translate