Violation Detail
Standard Cited: 19100269 M02 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1409103.015
Citation: 01001
Citation Type: Other
Abatement Date: 09/17/2019 2
Initial Penalty: $11,934.00
Current Penalty: $5,967.00
Issuance Date: 08/28/2019
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): R
Gravity:
Report ID: 0626700
Contest Date:
Final Order: 09/23/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/23/2019 | $5,967.00 | 09/17/2019 | Other | |
| Penalty | Z: Issued | 08/28/2019 | $11,934.00 | 09/17/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(m)(2)(i): The employee that the employer designates pursuant to paragraph (m)(2) of this section as being in charge of the clearance shall make a request of the system operator to de-energize the particular section of line or equipment which comply with all the requirements of paragraph (m)(3) of this section. a) On or about June 8, 2019, at the jobsite, employees were exposed to electrical hazards when a power line was not properly de-energized through tagging, verification and grounding before work was performed.