Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1408965.015
Citation: 01005
Citation Type: Serious
Abatement Date: 09/16/2019 2
Initial Penalty: $3,978.00
Current Penalty: $2,386.80
Issuance Date: 08/20/2019
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 1
Report ID: 0729700
Contest Date:
Final Order: 09/10/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/10/2019 | $2,386.80 | 09/16/2019 | Serious | |
| Penalty | Z: Issued | 08/20/2019 | $3,978.00 | 09/16/2019 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: Employees were exposed to fire and electrical shock hazards. Employees engaged in housekeeping and grain handling activities in the feed mill and elevator were exposed to fire and electrical shock hazards in that four (4) of the ON/OFF safety switch boxes located outside of Bin #16, between Bin #6 and Bin #8 were not properly labeled to indicate their intended use. 29 CFR 1903.19(c)(1) requires certification that the abatement of the above violation is complete.