Violation Detail
Standard Cited: 19260651 C02 Specific Excavation Requirements.
Inspection Nr: 1403564.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $10,210.00
Current Penalty: $5,000.00
Issuance Date: 08/26/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 11/14/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/14/2019 | $5,000.00 | Serious | ||
| Penalty | Z: Issued | 08/26/2019 | $10,210.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees. Location - 34 Munroe Street, Lynn, MA. On or about May 24, 2019, employees were not provided with a safe means of egress from an excavation greater than twenty five feet wide.
Translate