Violation Detail
Standard Cited: 19100147 C06 I A The control of hazardous energy (lockout/tagout).
Inspection Nr: 1402859.015
Citation: 01004
Citation Type: Serious
Abatement Date: 09/23/2019 2
Initial Penalty: $3,978.00
Current Penalty: $2,386.80
Issuance Date: 09/03/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 1
Report ID: 0522300
Contest Date:
Final Order: 09/25/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/25/2019 | $2,386.80 | 09/23/2019 | Serious | |
| Penalty | Z: Issued | 09/03/2019 | $3,978.00 | 09/23/2019 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i)(A): The periodic inspection of the energy control procedure was not performed by an authorized employee other than the one utilizing the energy control procedure being inspected: On or about May, 20, 2019, the employer did not conduct lockout tagout periodic inspection procedures for the service and maintenance of machinery such as but not limited to aluminum press lines #7 and #9.