Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1401223.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 07/18/2019 2
Initial Penalty: $13,260.00
Current Penalty: $6,630.00
Issuance Date: 06/19/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0523900
Contest Date:
Final Order: 07/10/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/10/2019 | $6,630.00 | 07/18/2019 | Serious | |
| Penalty | Z: Issued | 06/19/2019 | $13,260.00 | 07/18/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): (a) Hide Room, Flesher Machine; On or about May 10, 2019, the Fleshing Machine lockout procedure (HR-503) utilized for the removal of the manure roller/auger was not specific to the process and did not identify adequate steps for the control of hydraulic and electrical energy sources.