Violation Detail
Standard Cited: 19100184 C09 Slings.
Inspection Nr: 1397664.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/22/2019 2
Initial Penalty: $10,419.00
Current Penalty: $10,419.00
Issuance Date: 10/11/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 5
Report ID: 0418600
Contest Date:
Final Order: 11/04/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/04/2019 | $10,419.00 | 10/22/2019 | Serious | |
| Penalty | Z: Issued | 10/11/2019 | $10,419.00 | 10/22/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.184(c)(9): Employee(s) were not kept clear of load(s) suspended, or about to be lifted by sling(s): a) Paper Machine #2 Fourdrinier/#5 Wire Return Roll (Brewton Operations): On or about April 17, 2019, the employer failed to keep all employees clear of suspended loads during shutdown operations exposing employees to struck-by, caught-in and crushed-by hazards.
Translate