Violation Detail
Standard Cited: 19100265 C18 I Sawmills.
Inspection Nr: 1394457.015
Citation: 01005
Citation Type: Serious
Abatement Date: 08/26/2019 2
Initial Penalty: $5,304.00
Current Penalty: $3,712.80
Issuance Date: 07/29/2019
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 08/21/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/21/2019 | $3,712.80 | 08/26/2019 | Serious | |
| Penalty | Z: Issued | 07/29/2019 | $5,304.00 | 08/26/2019 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.265(c)(18)(i): Means were not provided to guard against accidental injury to personnel at conveyor transfer, loading, or discharge point(s): (a) Old Mill, Debarker; The underground conveyance system utilized to move wood chips was not adequately guarded. (b) Old Mill, Debarker; The log conveyance system had an unguarded chain and sprocket.
Translate