Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1394457.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 10/18/2019 2
Initial Penalty: $9,282.00
Current Penalty: $6,497.40
Issuance Date: 07/29/2019
Nr Instances: 3
Nr Exposed: 8
Related Event Code (REC):
Gravity: 10
Report ID: 0523900
Contest Date:
Final Order: 08/21/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/21/2019 | $6,497.40 | 10/18/2019 | Serious | |
| Penalty | Z: Issued | 07/29/2019 | $9,282.00 | 08/26/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: (a) New Mill; The energy control procedure for the Brewer Head Saw failed to identify the primary energy sources such as the power disconnect, and the subsequent steps for affixing lock(s) at the disconnect location(s), in order to isolate energy at the source. (b) New Mill; The energy control procedure for the Nicholson Debarker failed to identify the primary energy sources such as the power disconnect, and the subsequent steps for affixing lock(s) at the disconnect location(s), in order to isolate energy at the source. (c) Old Mill; The energy control procedure for the McDonough Bandsaw failed to identify the primary energy sources such as the power disconnect, and the subsequent steps for affixing lock(s) at the disconnect location(s), in order to isolate energy at the source.