Standard Cited: 19100219 C04 II Mechanical power-transmission apparatus.
Inspection Nr: 1392047.015
Citation: 01003E
Citation Type: Serious
Abatement Date: 10/11/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/06/2019
Nr Instances: 2
Nr Exposed: 6
Related Event Code (REC):
Gravity: 1
Report ID: 0521100
Contest Date:
Final Order: 09/27/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2019 | $0.00 | 10/11/2019 | Serious | |
Penalty | Z: Issued | 09/06/2019 | $0.00 | 10/11/2019 | Serious |
Text For Citation: 01 Item/Group: 003E Hazard:
29 CFR 1910.219(c)(4)(ii): The unused keyway(s) of projecting shaft end(s) were not filled up or covered: a) On or about 4/18/2019, Conveyor shafts that were sticking out in the 7B press area did not have the open key ways filled in creating an entanglement hazard.