Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1391674.015
Citation: 01001
Citation Type: Other
Abatement Date: 11/05/2019 2
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 10/01/2019
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): R
Gravity:
Report ID: 0214700
Contest Date: 10/25/2019
Final Order: 12/30/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/30/2019 | $13,260.00 | 11/05/2019 | Other | |
| Penalty | C: Contested | 10/28/2019 | $13,260.00 | 11/05/2019 | Serious | |
| Penalty | Z: Issued | 10/01/2019 | $13,260.00 | 11/05/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation of machinery was not guarded to prevent employee(s) from having any part of their body in the danger zone during operating cycle(s): a) Workplace, production area- Employee was operating a Piranha 95 Ton Press brake and the guard that had no guard to protect employees from point of operation; on or about 4/1/19. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Translate