Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1388204.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $7,971.00
Current Penalty: $5,978.25
Issuance Date: 04/16/2019
Nr Instances: 3
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 05/03/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/03/2019 | $5,978.25 | Serious | ||
| Penalty | Z: Issued | 04/16/2019 | $7,971.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: a) Mold Machine 1 - Employees molding PVC pipes were exposed to point of operation hazards from unguarded molding press 1, on or about March 27th, 2019. b) Mold Machine 2 - Employees molding PVC pipes were exposed to point of operation hazards from unguarded molding press 2, on or about March 27th, 2019. c) Mold Machine 3 - Employees molding PVC pipes were exposed to point of operation hazards from unguarded molding press 3, on or about March 27th, 2019. No abatement certification or documentation required.