Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1387022.015
Citation: 01002
Citation Type: Serious
Abatement Date: 07/03/2019 2
Initial Penalty: $13,260.00
Current Penalty: $7,956.00
Issuance Date: 06/21/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 07/23/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/23/2019 | $7,956.00 | 07/03/2019 | Serious | |
| Penalty | Z: Issued | 06/21/2019 | $13,260.00 | 07/03/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.416(a)(1): When an employee was not protected against electric shock by de-energizing the circuit and grounding it or by guarding it effectively by insulation or other means, the employer permitted an employee to work in proximity to a part of an electric power circuit that the employee could contact the electric power circuit in the course of work: a) The employer permitted employees to work in proximity to electric power circuits who was not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means.
Translate