Violation Detail
Standard Cited: 19100261 B01 Pulp, paper, and paperboard mills.
Inspection Nr: 1386390.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $10,627.00
Current Penalty: $9,700.00
Issuance Date: 09/12/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 10/04/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/04/2019 | $9,700.00 | Serious | ||
| Penalty | Z: Issued | 09/12/2019 | $10,627.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.261(b)(1): The employer did not ensure that the main power disconnect switch or valve, or both, controlling its source of power or flow of material, was locked out or blocked off with padlock, blank flange, or similar device before conducting any maintenance, inspection, cleaning, adjusting, or servicing of equipment (electrical, mechanical, or other) that required entrance into or close contact with the machinery or equipment: (a) #5 High Density Tank Area - On or about March 19, 2019 employees were allowed to pull and repair CV- O8 valve without ensuring the system was lockout. Employees were exposed to burn hazards.
Translate