Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1381822.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/09/2019 2
Initial Penalty: $8,525.00
Current Penalty: $7,759.00
Issuance Date: 04/09/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 04/24/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/24/2019 | $7,759.00 | 07/09/2019 | Serious | |
| Penalty | Z: Issued | 04/09/2019 | $8,525.00 | 07/09/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a) Feather Room - An employee was impaled by a stainless steel bar that was thrown from the rotating drum of the extractor. The employer did not ensure that a guard was installed on the extractor to prevent employees from accessing the drum while in operation, on or before February 26, 2019. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.