Violation Detail
Standard Cited: 19100268 N09 Telecommunications.
This violation item has been deleted.
Inspection Nr: 1378250.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/21/2019 2
Initial Penalty: $9,282.00
Current Penalty: $0.00
Issuance Date: 03/15/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0111100
Contest Date: 04/03/2019
Final Order: 12/26/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 01/14/2020 | $9,282.00 | 03/21/2019 | Serious | |
| Penalty | F: Formal Settlement | 12/26/2019 | $0.00 | 03/21/2019 | Serious | |
| Penalty | Z: Issued | 03/15/2019 | $9,282.00 | 03/21/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.268(n)(9): Pole(s) or structure(s) were not guyed, braced or otherwise supported, to prevent failure, during the removal of wire and cable: Pole #1 - During the removal of wire and cable, a pole was not guyed, braced or otherwise supported, to prevent failure.
Translate