Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1378083.015
Citation: 01002
Citation Type: Serious
Abatement Date: 07/18/2019 2
Initial Penalty: $6,630.00
Current Penalty: $4,442.00
Issuance Date: 06/28/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 07/22/2019
Final Order: 03/04/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 03/04/2020 | $4,442.00 | 07/18/2019 | Serious | |
Penalty | C: Contested | 07/23/2019 | $6,630.00 | 07/18/2019 | Serious | |
Penalty | Z: Issued | 06/28/2019 | $6,630.00 | 07/18/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a) Small Assembly Area, on or about 2/11/19: Press used to assemble buss support parts was not provided with point of operation guarding.