Violation Detail
Standard Cited: 19100179 B06 I Overhead and gantry cranes.
Inspection Nr: 1378075.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/28/2019 2
Initial Penalty: $13,260.00
Current Penalty: $7,956.00
Issuance Date: 06/04/2019
Nr Instances: 3
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 07/18/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/18/2019 | $7,956.00 | 06/28/2019 | Serious | |
| Penalty | Z: Issued | 06/04/2019 | $13,260.00 | 06/28/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.179(b)(6)(i): Minimum clearance of 3 inches overhead and 2 inches laterally shall be provided and maintained between crane and obstructions in conformity with Crane Manufacturers Association of America, Inc, Specification No. 61, which is incorporated by reference as specified in Sec. 1910.6, (formerly the Electric Overhead Crane Institute, Inc): This violation occurred on or about February 5, 2019, in the mechanical room where employees installing a flush loop on new hot water piping attached to existing hot water piping with a butterfly valve without isolating the hot water in the pipes.
Translate