Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1375569.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,661.00
Current Penalty: $5,796.60
Issuance Date: 07/12/2019
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 08/07/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/07/2019 | $5,796.60 | Serious | ||
| Penalty | Z: Issued | 07/12/2019 | $9,661.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Heat Treat Department: On or about January 31, 2019, procedures were not utilized for the control of potential hazardous energy from GK Feeder, exposing employees to crushing hazards while attempting to release a casting in the transfer carriage.
Translate