Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1368416.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 07/19/2019 2
Initial Penalty: $13,260.00
Current Penalty: $7,965.00
Issuance Date: 05/09/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 06/04/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/04/2019 | $7,965.00 | 07/19/2019 | Serious | |
| Penalty | Z: Issued | 05/09/2019 | $13,260.00 | 06/07/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout is used for energy control, the periodic inspection shall include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. On or about December 17, 2018, the employer did not review with each employee their responsibilities under the energy control procedure for the Prime Equipment (Spokane, WA) PV-8500 Model Thermo Film Machine following the Periodic Inspection.
Translate