Violation Detail
Standard Cited: 19100179 J02 IV Overhead and gantry cranes.
Inspection Nr: 1365689.015
Citation: 01002B
Citation Type: Other
Abatement Date: 05/13/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/08/2019
Nr Instances: 1
Nr Exposed: 55
Related Event Code (REC): R
Gravity:
Report ID: 0522500
Contest Date:
Final Order: 04/23/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/23/2019 | $0.00 | 05/13/2019 | Other | |
| Penalty | Z: Issued | 04/08/2019 | $0.00 | 05/13/2019 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.179(j)(2): Frequent inspection. The following items shall be inspected for defects at intervals as defined in paragraph (j)(1)(ii) of this section or as specifically indicated, including observation during operation for any defects which might appear between regular inspections. All deficiencies such as listed shall be carefully examined and determination made as to whether they constitute a safety hazard: 29 CFR 1910.179(j)(2)(iv): Hoist chains, including end connections, for excessive wear, twist, distorted links interfering with proper function, or stretch beyond manufacturer's recommendations. Visual inspection daily; monthly inspection with a certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier of the chain which was inspected. a. Throughout the facility, monthly inspection of overhead crane hoist chains were not performed and certified.
Translate