Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1365281.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $3,880.00
Current Penalty: $2,716.00
Issuance Date: 01/11/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 02/04/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/04/2019 | $2,716.00 | Serious | ||
| Penalty | Z: Issued | 01/11/2019 | $3,880.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): At the facility: On or about December 7, 2018 all energy sources to control energy to air compressor motor, TECO Westinghouse, MAX-SE, SER Number HOH238769008 were not located and operated in a manner to isolate the equipment from electrical power during servicing, exposing an employee to an amputation hazard.