Violation Detail
Standard Cited: 19100217 D09 I Mechanical power presses.
Inspection Nr: 1364857.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 04/05/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/05/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0213600
Contest Date:
Final Order: 03/21/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/21/2019 | $0.00 | 04/05/2019 | Serious | |
| Penalty | Z: Issued | 03/05/2019 | $0.00 | 04/05/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.217(d)(9)(i): The employer did not establish a die setting procedure for mechanical power press(es) that would ensure compliance with 29 CFR 1910.217(c) a) On or about 12/07/18 in the Fabrication Department; employees involved in die changing on the mechanical power presses, such as but not limited to; Minster Press # 200, 201, 348, 349, 353 were exposed to caught between/amputation hazards when the employer did not establish a procedure for shutting off and controlling the energy sources during these activities. ABATEMENT CERTIFICATION REQUIRED