Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1363206.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 05/14/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/24/2019
Gravity: 10
Report ID: 0418600
Contest Date:
Final Order: 05/31/2019
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/31/2019 | $13,260.00 | 05/24/2019 | Serious | |
| Penalty | Z: Issued | 05/14/2019 | $13,260.00 | 05/24/2019 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone during operating cycle: a) Line 3; On or about November 19, 2018 and at times prior, the employer allowed his employees to operate the Line 3 Slit Film Extruder machine without ensuring the fibrillator was properly guarded exposing his employees to amputation hazards.
Translate