Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1362396.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 06/05/2019 2
Initial Penalty: $8,051.00
Current Penalty: $4,831.00
Issuance Date: 05/07/2019
Nr Instances: 1
Nr Exposed: 80
Related Event Code (REC): R
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 05/23/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/23/2019 | $4,831.00 | 06/05/2019 | Serious | |
| Penalty | Z: Issued | 05/07/2019 | $8,051.00 | 06/05/2019 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to , the following: Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: a) On or about November 28, 2018, the Lockout / Tag Out Instructions for the Redline Seam Welder (A20295), dated October 17, 2018, did not include instructions for removing pneumatic pressure from the sheet pusher air cylinder when a jammed metal sheet prevents the sheet pusher from extending completely and returning to the home position. A check valve prevents the air cylinder pneumatic pressure from bleeding off when the Main Air Supply is shut off.