Standard Cited: 19260651 B01 Specific Excavation Requirements.
This violation item has been deleted.
Inspection Nr: 1359970.015
Citation: 01001
Citation Type: Serious
Abatement Date: 05/28/2019
Initial Penalty: $11,934.00
Current Penalty: $0.00
Issuance Date: 05/08/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0625500
Contest Date:
Final Order: 05/30/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/30/2019 | $0.00 | 05/28/2019 | Serious | |
| Penalty | Z: Issued | 05/08/2019 | $11,934.00 | 05/28/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.651(b)(1): The estimated location of underground utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work: At Sand Hills Pipeline MLV 11 Phase 3: On or about November 12, 2018, and at times prior thereto, employees were exposed to a fire hazard when workers utilizing a T1660 Mechanical Trencher cut into a pipeline crossing which had not been identified/located prior to the excavation.