Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1358176.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/17/2019 2
Initial Penalty: $8,051.00
Current Penalty: $4,000.00
Issuance Date: 04/12/2019
Nr Instances: 1
Nr Exposed: 160
Related Event Code (REC):
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 04/25/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/25/2019 | $4,000.00 | 05/17/2019 | Serious | |
| Penalty | Z: Issued | 04/12/2019 | $8,051.00 | 05/17/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. a) On or about 11/6/2018, the employer had not completed their periodic annual inspections for their authorized employees as required on an annual basis.