Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1356836.015
Citation: 01002
Citation Type: Serious
Abatement Date: 01/08/2019 2
Initial Penalty: $9,239.00
Current Penalty: $6,467.00
Issuance Date: 11/19/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 12/11/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/11/2018 | $6,467.00 | 01/08/2019 | Serious | |
Penalty | Z: Issued | 11/19/2018 | $9,239.00 | 01/08/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. On or about October 11, 2018, the employer did not conduct periodic inspections of the energy control procedures to ensure machine operators performing service and maintenance operations, including but not limited too; die changes and clearing jams, on the Switchback box forming machines were following the procedures and the requirements of the standard for energy isolation and control.