Violation Detail
Standard Cited: 19260451 F04 General requirements.
Inspection Nr: 1351203.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 12/28/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/03/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 12/19/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/19/2018 | $0.00 | 12/28/2018 | Serious | |
| Penalty | Z: Issued | 12/03/2018 | $0.00 | 12/28/2018 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1926.451(f)(4): Any part of a scaffold damaged or weakened such that its strength is less than that required by paragraph (a) of this section shall be immediately repaired or replaced, braced to meet those provisions, or removed from service until repaired. a)On or about 10/4/2018 an employer did not remove from service pallets with broken slats, this resulted in the employee falling approximately 8' to the concrete floor.
Translate