Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1350481.015
Citation: 02001
Citation Type: Other
Abatement Date: 12/06/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/14/2018
Nr Instances: 10
Nr Exposed: 12
Related Event Code (REC):
Gravity:
Report ID: 0523300
Contest Date:
Final Order: 12/12/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 11/14/2018 | $0.00 | 12/06/2018 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: On or about October 2, 2018 the employer did not certify that periodic inspection of energy control procedures had been performed for equipment on the "Will A" and "Will B" process lines.