Violation Detail
Standard Cited: 19100252 A03 II General requirements.
Inspection Nr: 1345416.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 03/05/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/21/2019
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 03/22/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/22/2019 | $0.00 | 03/05/2019 | Serious | |
| Penalty | Z: Issued | 02/21/2019 | $0.00 | 03/05/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities, or containers were not vented to permit the escape of air or gases before preheating, cutting, or welding was performed: At this location, the storage tanks which had contained flammable material were not vented prior to the cutting bolts off a hatch with a portable hand grinder.