Violation Detail
Standard Cited: 19100147 C06 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1342244.015
Citation: 01001
Citation Type: Other
Abatement Date: 11/27/2018 2
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 10/30/2018
Nr Instances: 1
Nr Exposed: 34
Related Event Code (REC):
Gravity:
Report ID: 0626300
Contest Date:
Final Order: 11/27/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/27/2018 | $12,934.00 | 11/27/2018 | Other | |
| Penalty | Z: Issued | 10/30/2018 | $12,934.00 | 11/27/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i)(B): The periodic inspection of the energy control procedure was not conducted to correct any deviations or inadequacies identified: a) This violation was discovered on August 28, 2018; where at least one (1) employee was exposed to caught-in hazards.
Translate