Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1342170.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/23/2018
Initial Penalty: $7,484.00
Current Penalty: $0.00
Issuance Date: 10/11/2018
Nr Instances: 1
Nr Exposed: 16
Related Event Code (REC): R
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 11/09/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/09/2018 | $0.00 | 10/23/2018 | Serious | |
| Penalty | Z: Issued | 10/11/2018 | $7,484.00 | 10/23/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) On or about 08/21/2018 - Plant A, Fat Presser #2, machinery such as but not limited to fat pressers had not been evaluated at least annually to ensure there were no deficiencies.