Violation Detail
Standard Cited: 19260451 C03 General requirements.
Inspection Nr: 1339425.015
Citation: 01001
Citation Type: Serious
Abatement Date: 09/24/2018 2
Initial Penalty: $6,467.00
Current Penalty: $6,000.00
Issuance Date: 09/11/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0214200
Contest Date:
Final Order: 09/25/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/25/2018 | $6,000.00 | 09/24/2018 | Serious | |
| Penalty | Z: Issued | 09/11/2018 | $6,467.00 | 09/24/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, posts, frames, and uprights shall be plumb and braced to prevent swaying and displacement. Location: 25 Taylor St Millburn. NJ 07041 a) Employees engaged in construction activities were exposed to fall hazards approximately 20ft. to the ground below while working from a supported scaffold that was not fully braced on or about 8/17/18.
Translate