Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1330891.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/31/2018 2
Initial Penalty: $8,481.00
Current Penalty: $4,240.50
Issuance Date: 09/11/2018
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 10/04/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/04/2018 | $4,240.50 | 10/31/2018 | Serious | |
| Penalty | Z: Issued | 09/11/2018 | $8,481.00 | 10/05/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) On or about 07/17/2018 - Par Fry Line 1, periodic inspections had not been performed for the Barrel Breader/Pre-Duster since 10/11/2016.