Violation Detail
Standard Cited: 19260602 A03 I Material handling equipment.
Inspection Nr: 1328975.015
Citation: 01001
Citation Type: Other
Abatement Date: 11/08/2018 2
Initial Penalty: $5,543.00
Current Penalty: $5,543.00
Issuance Date: 09/21/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity:
Report ID: 0317700
Contest Date:
Final Order: 10/19/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/19/2018 | $5,543.00 | 11/08/2018 | Other | |
| Penalty | Z: Issued | 09/21/2018 | $5,543.00 | 11/08/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.602(a)(3)(i): The employer moved or caused to be moved construction equipment or vehicles upon an access roadway or grade without ensuring the access roadway or grade was constructed and maintained to safely accommodate the movement of equipment and vehicles: a) Atlantic Sunrise Pipeline Project, Campbell Rd., Catawissa, PA: A temporary bridge was not adequately supported in that the right side runner of the bridge broke during crossing causing a side boom tractor to slide off and roll over into the creek, on or about July 9, 2018. Abatement Certification Required.