Violation Detail
Standard Cited: 19100303 B01 General.
Inspection Nr: 1325270.015
Citation: 01004
Citation Type: Serious
Abatement Date: 09/20/2018 2
Initial Penalty: $4,434.00
Current Penalty: $2,660.40
Issuance Date: 08/24/2018
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 09/18/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/18/2018 | $2,660.40 | 09/20/2018 | Serious | |
| Penalty | Z: Issued | 08/24/2018 | $4,434.00 | 09/20/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: Employees were exposed electrical shock hazards while operating the pendant control devices on the: (a) Crane #3 Northeast 5 ton bridge crane (b) Crane #7 2 ton bridge crane.
Translate