Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1321410.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/26/2018 2
Initial Penalty: $12,934.00
Current Penalty: $10,347.00
Issuance Date: 07/18/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 07/24/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/24/2018 | $10,347.00 | 07/26/2018 | Serious | |
| Penalty | Z: Issued | 07/18/2018 | $12,934.00 | 07/26/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Dextrin Flash Dryer Area - On or about June 3, 2018, the procedure for the feed hopper airlock was not utilized prior to the removal of the rotary star impeller cover being removed.