Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1318109.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 11/13/2018 2
Initial Penalty: $5,174.00
Current Penalty: $2,875.00
Issuance Date: 11/06/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 11/20/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/20/2018 | $2,875.00 | 11/13/2018 | Serious | |
| Penalty | Z: Issued | 11/06/2018 | $5,174.00 | 11/13/2018 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) On or about May 22, 2018, employees were exposed to electric shock while working from an aerial lift in close proximity to a 12kV overhead power line. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.