Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1315266.015
Citation: 01005
Citation Type: Serious
Abatement Date: 09/25/2018 2
Initial Penalty: $3,880.00
Current Penalty: $2,716.00
Issuance Date: 08/22/2018
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 09/04/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/04/2018 | $2,716.00 | 09/25/2018 | Serious | |
| Penalty | Z: Issued | 08/22/2018 | $3,880.00 | 09/25/2018 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, and rotating parts: a) Plant - On or about 05/10/18 and at times prior thereto employees operated the polymer baths. The paddled rollers were not guarded. b) Plant - On or about 05/10/18 and at times prior thereto employees operated the polymer baths. The screw conveyor (auger) was not guarded. Or in the alternative: a) Plant - On or about 05/10/18 and at times prior thereto employees operated the polymer baths. The paddled rollers were not guarded. b) Plant - On or about 05/10/18 and at times prior thereto employees operated the polymer baths. The screw conveyor (auger) was not guarded. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Translate