Violation Detail
Standard Cited: 19100217 C02 I Mechanical power presses.
Inspection Nr: 1314710.015
Citation: 01004
Citation Type: Serious
Abatement Date: 11/16/2018 2
Initial Penalty: $6,467.00
Current Penalty: $6,467.00
Issuance Date: 10/18/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 11/14/2018
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/18/2018 | $6,467.00 | 11/16/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.217(c)(2)(i): Every point of operation guard shall meet the following design, construction, application, and adjustment requirements: It shall prevent entry of hands or fingers into the point of operation by reaching through over, under or around the guard; It shall conform to the maximum permissible openings of Table O-10; It shall, in itself, create no pinch point between the guard and moving parts of the machine; It shall utilize fasteners not readily removable by operator, so as to minimize the possibility of misuse or removal of essential parts; It shall facilitate its inspection, and it shall offer maximum visibility of the point of operation consistent with other requirements: On or about May 9, 2018, the guarding on the E.W. Bliss C-75 Ton press S/N H6969HP53033 Press #10 located in the main building did not have the fasteners installed on the point of operation barrier guards allowing them to easily be removed by the operator.
Translate